mitel 12 ft flat black long lead handset cord ip 5000 series p | Shop The World
From USA
NewMitel
Mitel 12 Ft Flat Black Long Lead Handset Cord For IP 5000 Series Phones
ℹ
Products from the USA may come with an input voltage of 110V–120V, requiring a step-down transformer. Check the device wattage to select the correct power converter.
•Works with Mitel IP 5000 Series Phones (ie. 5312 5320 5320e 5324 5330 5330e 5340 5340e 5360)
•2 FT Coiled
•12 FT Uncoiled
•one end with 3 inch and and another with 2 inch flat leader.